It’s the last Monday before we go home to Canada, and we still have a lot of work to be done. Today, the plumber will be here jackhammering the floor out of the bathroom in order to install a drain in the new shower. They are suppose to be here at 8 a.m. In the afternoon the tilers come to install the water proof membrane and the shower pan. Then it’s a matter of drying before the granite can be installed. I doubt we’ll get to see any of that before we leave but one can always be hopeful. It’s a beautiful patterned granite called Rainforest, a dark olive green colour with bold veins of red and sand running through it.
We’ll have been here almost three weeks this visit and have been to the beach only three times… still it has been on of the best trips that we’ve had. We’ve worked very hard together on installing the cabinets, lighting, painting, replacing the air conditioner, tiling, and reconstructing the bathroom. We’ve finished replacing most of the old furniture and have rearranged the living space yet one more time. It’s looking quite spacious and comfortable.
The uneven floor tiles that we’re improperly installed have continued to be an annoyance to us both, but yesterday we learned of a company called Surface Solutions that can come in a level and polish the floor with giant sanders. They come highly recommended. We will look into them, and try to recover some of the cost from the original installer.
Our new website matches the condo, half done and being constructed even as we start to use it.